Northwest Territories · Editable Word template

Northwest Territories COR safety manual template

A complete written health and safety program for Northwest Territories construction employers, laid out section by section on the Northern Safety Association (NSA) COR audit and written to the Safety Act and the Occupational Health and Safety Regulations. It arrives as an editable Word file you make your own: your name, your logo, your job titles and your work.

A look inside

Sample pages from the manual, marked and cut short. Your copy has no watermark.

Cover of the Northwest Territories COR safety manual template, with a logo box and the company name field
Cover with room for your logo and company name
Table of contents of the Northwest Territories COR safety manual template, laid out by NSA COR audit section including return to work and substance abuse prevention
Linked table of contents, laid out on the 15 sections of the NSA COR audit
The portable ladders safe work practice from the Northwest Territories safety manual template, each rule cited to the Occupational Health and Safety Regulations
Section 3: twelve starter safe work practices for construction, portable ladders shown
Five by five risk matrix with severity, likelihood and colour-coded risk bands from the Northwest Territories safety manual template
Section 2: the 5 × 5 risk matrix, the same one TruStar Connect uses
COR cross-reference table mapping NSA audit questions to manual sections
Appendix A: all 80 NSA documentation questions mapped to the section that answers them
Site-specific hazard assessment form from the Northwest Territories safety manual template
29 forms, ready to print: site-specific hazard assessment shown

What’s in the manual

1. Health and safety policy and responsibility

A signed, dated policy reviewed every year, the written occupational health and safety program the regulations require and its contents, the policies every employer needs whatever its size, and responsibilities for managers, supervisors, workers, the principal contractor, the Committee or representative, subcontractors and visitors.

2. Workplace hazard assessment and control

Formal hazard assessments for start-up, each type of work and each job or position, the 5 × 5 risk matrix, critical tasks, controls with a person and a date for each, ongoing site-specific assessments, and evaluating and monitoring subcontractors.

3. Safe work practices

Twelve starter practices for common construction work: site conduct, ladders, working at heights, tools, lifting, powered mobile equipment, silica, working alone, heat and cold, hazardous products, temporary power and overhead lines, and excavations, each ending with the Northwest Territories legislation that applies.

4. Safe job procedures

Step-by-step procedures for six critical tasks, from lockout and fall arrest to entering a trench and hoisting, and a table of every written program, plan and procedure Northwest Territories law requires.

5. Company rules

Written company and site rules given to every worker, and a progressive discipline process that is applied the same way every time and never used against a worker for exercising their rights.

6. Personal protective equipment

The work that needs PPE and how it is chosen, written procedures for fitting, care and use of specialized PPE, training, and inspection and maintenance.

7. Preventative maintenance

An inventory of facilities, tools, equipment and vehicles, maintenance schedules and records, who may do the work, and taking defective equipment out of service.

8. Training and communication

Orientation signed by the worker and the company before work starts and repeated every three years, the training and certifications the law requires, supervisor training including the approved regulatory familiarization program, safety meetings and toolbox talks.

9. Inspections

A written inspection procedure with a set frequency, standard checklists, who inspects, how workers report unsafe conditions, and correcting and sharing what is found.

10. Investigations and reporting

Notice to the Chief Safety Officer of accidents causing serious bodily injury and dangerous occurrences, the employer’s report to the WSCC within three days, near misses, investigations that find direct and indirect causes, corrective action and senior management review.

11. Emergency preparedness

Emergency plans for each site, equipment, roles, rescue and evacuation, testing, the written fire safety plan and yearly drill the regulations require, extinguishers, and first aid under Part 5 of the regulations: the first aid risk assessment, attendants, kits and the first aid register.

12. Records and statistics

Document control and the records the law gives a period to, health and safety activity summaries, year-over-year trends, and COR action plans that are shared and carried out.

13. Legislation

Written so workers and supervisors can answer the auditor’s interview questions: the law on site, their rights, refusing work step by step including the Committee stage, protection from discriminatory action, and the written harassment and violence policies the regulations require.

14. Return to work

A signed return-to-work policy, roles for the designated person, supervisors, the worker and the WSCC case manager, how suitable duties are found, injury reporting, the written safe return-to-work plan, staying in touch, and the yearly review.

15. Substance abuse prevention

An alcohol and drug policy that includes every element of the written impairment policy the regulations require, fitness-for-duty steps for supervisors, assessment and return to work, training, consequences and confidential support.

Appendix A. COR cross-reference

Every one of the 80 documentation questions in the NSA COR audit, what it looks for in plain words, the section that answers it, and whether the auditor will also want your records. Each entry links to its section.

Appendix B. Forms

29 print-ready forms that match the manual, each on one page with a form code, from policy review and hazard assessments to subcontractor evaluation, a work refusal record, a safe return-to-work plan and a fitness-for-duty record.

Built around the NSA COR audit

The Northern Safety Association is the only body that issues COR in the Northwest Territories, and it uses its own audit tool rather than the national harmonized one. This manual follows that tool section by section, all 15 of them, including its sections on return to work and substance abuse prevention.

The audit scores documents, interviews and observations, and NSA certification needs 80% overall. This manual answers each of the 80 documentation questions in writing, and Appendix A shows where. No template can guarantee a certificate on its own, and we don’t claim to. What it gives you is a complete, audit-shaped program to put in place.

Written to Northwest Territories law as it stands

Every requirement is cited to the Safety Act, the Occupational Health and Safety Regulations, the Workers’ Compensation Act, the Employment Standards Act or the Human Rights Act, read from the territory’s official consolidations. It uses the territory’s own terms (principal contractor, Joint Occupational Health and Safety Committee, Chief Safety Officer, accident causing serious bodily injury), and nothing in it is borrowed from another jurisdiction’s rules.

Where the law sets no number, such as how often to inspect or how long to keep most records, the manual says so and gives you a highlighted default to set yourself. When the law changes, we update the template and you get the new edition free.

Who it is for

Northwest Territories construction employers working toward COR with the NSA. It is also the written occupational health and safety program the regulations require at 20 or more workers at a work site, and it includes the written harassment, violence, impairment and fire safety policies every employer needs, whatever its size.

Working in Nunavut too? The NSA audits there with the same tool, but the law is not the same, so we publish a separate Nunavut edition written to it.

Lifetime updates

When legislation or the audit changes, we publish a new edition and email everyone who bought the template. Every update is free, for as long as we publish it.

  1. Version 1.0 October 1, 2026

    • First edition, laid out on the Northern Safety Association’s COR audit (v8), all 15 sections.
    • Written to the Safety Act and the Occupational Health and Safety Regulations as consolidated to R-090-2024, with the Workers’ Compensation Act, Employment Standards Act and Human Rights Act.

Working in more than one province?

Buy templates together and save on the whole order: 2 for 10% off, 3 for 15% off, 4+ for 20% off.

Questions

What format is the manual in?

An editable Microsoft Word (.docx) file on US Letter pages. It works best in desktop Word for Windows or Mac. It also opens in Google Docs and Word on the web, where you use Find and replace to put your company name in.

Will this manual get us COR?

It gives you the written program the COR audit reviews, laid out on the NSA audit, with every documentation question answered and cross-referenced. Certification also depends on your records, employee interviews and what the auditor observes on site, so no template can promise a pass. If you want help putting it in place, or a gap analysis before your audit, our team does that too.

Does it include the return to work and substance abuse sections?

Yes. They are sections 14 and 15, written to what the NSA audit asks for. The manual is plain about the law: no Northwest Territories law requires a return-to-work program or regulates drug testing, but the regulations do require every employer to have a written impairment policy, and the Human Rights Act requires accommodation. Both sections are built on that.

Do I need a written safety program in the Northwest Territories?

Under the Occupational Health and Safety Regulations, an employer needs a written occupational health and safety program where 20 or more workers are at a work site, where a worker is exposed to noise above 85 dBA, or where the Chief Safety Officer directs it. Every employer, whatever its size, also needs written harassment, violence and impairment policies and a fire safety plan.

How do I get the file after I pay?

Your download is on the confirmation page the moment payment goes through, and we email you a download link as well.

What happens when the legislation or the audit changes?

We update the template, and you get every update free for as long as we publish it: lifetime updates at no extra charge. We email you when a new edition is ready, with what changed and a link to download it.

Does it work with TruStar Connect?

Yes. The manual rates risk on the same 5 × 5 matrix TruStar Connect uses for its hazard register and investigations, so if you run your program in Connect, your ratings, bands and actions carry straight over.

Can I use it for more than one company?

Each purchase is licensed to one company. Consultants setting up programs for several clients should contact us.

Want it built for you?

Our safety advisors tailor programs to your operations and take you through COR from gap analysis to audit day.

COR and SECOR preparedness